ENQUIRE
View Progress

Off EM Bypass

DISCOVER WORKSPACES THAT WORK FOR YOU

Enquire
  • Price
    Price on Request
  • Completion
    2025
image
image
image

Welcome to Offices That Parallel Your Style

Great Location, off EM Bypass | Super Premium Business Centre and Executive Lounge with Open Terrace and A Host of Amenities | Design Flexibility and Space Efficiency In Office Space From 406 Sq Ft (Carpet Area)

Floors
G+15
Sizes
406 sq.ft. (Carpet) onwards
Aminities
By the way

Specification

FOUNDATION
  • R.C. Foundation resting on cast-in-situ reinforced concrete bored piles
SUPERSTRUCTURE
  • Reinforced concrete framed structure using minimum M25 grade concrete conforming to IS-456 and Fe 500 Steel
WALLS
  • External Walls - AAC Block/ Fly Ash Bricks
  • Internal Walls - Common Area AAC Block/ Fly Ash Bricks
ULTIMATE ROOF
  • Reinforced concrete roof with appropriate water-proofing and heat reflective paint
FLOOR
  • Office Space & Showrooms - Concrete finish
  • Exclusive Office Terraces - Vitrified/ceramic tiles/stone flooring
  • Common Areas
    • Ground Floor main entrance Lobby -  Vitrified tile/ stone/ laminated wooden flooring with matching skirting with or without inlay works at designated areas
    • Lift Lobby and Office Floor Corridors - Vitrified tile/ stone with matching skirting with or without inlay works at designated areas
    • Staircases and Covered Car Park Areas - Vitrified tiles/kota stone finish.
    • Other Common Services Rooms - Concrete finish
WINDOWS
  • Standard Aluminium section casement windows (powder coated / anodised) with partially fixed and partially openable shutters and glazing of appropriate thickness
DOORS
  • Staircases - Will be provided with Fire Check Doors
  • Toilet - Sal wood door frame with 32 mm thick flush door shutters (laminated/painted) for external doors.
ELECTRICAL INSTALLATION
  • Office Space & Showrooms single point power supply to individual units from CESC source through dedicated substation
  • Toilet & Common Areas Electrical wiring with electrolytic copper conductors
WATER PROOFING
  • Water proofing to floors of common area Bathrooms, W.C.. Planter Boxes, Terraces and Ultimate Roof
AIR CONDITIONING
  • Office & Showroom areas will be available with adequately sized High Side of VRV system duly installed at extra cost
FIRE SUPPRESSION & DETECTION

Provision of adequate firefighting system as per WBFES recommendation with portable extinguishers, wet risers and sprinklers. Dedicated fire tank & pumps for the project. Fire detection and public address system as per WBFES requirements. Evacuation points and refuge platforms for human safety

POWER & BACKUP
  • 24 x 7 power supply with 100 % DG back up.
SAFETY & SECURITY
  • 24 x 7 vigilance facility with CCTV cameras at designated areas
FOUNDATION SUPERSTRUCTURE WALLS ULTIMATE ROOF FLOOR WINDOWS DOORS ELECTRICAL INSTALLATION WATER PROOFING AIR CONDITIONING FIRE SUPPRESSION & DETECTION POWER & BACKUP SAFETY & SECURITY

Downloads

HIRA No.

HIRA/P/KOL/2021/001264 - Web Link

Reserve a site visit

Call Call Whatsapp Whatsapp Enquire Enquire